The Pool Project - Assembly
|
| |
|
|
March 23 - The wall is up. We actually finished the liner today
too, but it was too dark to take a picture by then.
|
| |
|
|
|
March 24 - Chris works some wrinkles out of the liner.
|
March 24 - After the first load of water, Chris gets in to try it out.
|
| |
|
|
|
March 24 - The pool fills up quickly with this big hose.
|
March 24 - That's it for the water service.
|
| |
|
|
March 24 - That's it. We're done for the night.
|
| |
|
|
|
March 25 - Connecting the pump.
|
March 26 - We're done! The top rail is on and the solar cover is heating
up the water.
Chris decides to take a quick dip in the finished pool.
|